Multi-site master data build
Scope: Develop naming conventions and master data for remote power stations including functional location hierarchy and core asset structure, asset life plans, maintenance strategies and tactics. Identify and develop maintenance and task specific parts listings for all assets pre utilisation phase of the assets life cycle.
Success: A turnkey solution supplied to the operations department including all maintenance requirements and scheduling frequencies, maintenance and task specific Application Parts Lists and operating statistic profiles. This information allowed history to be built from the commissioning phase of the assets life cycle improving reliability analysis, cost analysis, ease of capitalisation of new assets and the optimisation of resources and stock holding during the utilisation phase of the physical assets.
Value: Documented process for the building of all master data for all new assets acquired by the organisation so this step in the operational readiness plan can be performed within the organisation for future newly constructed power stations. The above will ensure that the appropriate training, procedures and systems are in place to minimise the asset life cycle costs and maximize the payback period of the assets.